OSD’s Site Logistics Plan/Notes/Instructions
are two sheets outlining the OSD Site Logistics Plan with notes for the forthcoming construction of the new academic and residential buildings. Please study both sheets.
Sheet 1 depicts the campus map with construction area; construction fence posted around the construction area; construction gates with trailers and parking for the workers; emergency vehicle access; new school bus drop-off and pick-up area; new event parking and additional parking areas. There is a legend on each sheet illustrating what is what – e.g., orange line meaning a 6’ chain link construction fence around the construction area will be put up.
Sheet 2depicts the roadway access to both points (the construction area with parking area for the construction workers and construction trailers; and, the Harlow Vocational Wing area).
- With the two sheets clearly delineated, access to OSD will be from Morse Road and Indianola Avenue. Construction workers will access the new academic and residential buildings from Morse Road entrance.
-
OSD staff members can enter OSD from Morse Road; however, that road is to be designated one way. There will be “One Way” signs placed along the route. Also, there will be speed limit posts along the route and the speed limit is strictly 10 mph.
-
School busses and vans (or cars) will enter the Morse Road entrance and stop at the front entrance of the Administration Building to drop-off our students in the morning. In the afternoon, our students will be picked-up at the Harlow Vocational Wing (see boxed A on Sheet 1). The school busses/vans/cars will exit OSD at the Indianola Avenue.
-
Parking along the northernmost driveway must be one sided to allow emergency vehicles (e.g., hook and ladder truck to navigate through). The same is true for commercial vehicles (e.g., 18-wheel trucks). There will be “No Parking” and “10 mph” signs posted along that driveway.
You can download this list by clicking here. You must have Acrobat Reader to read this.
(Posted 4/09/10)